Clients

MUSEUM OF GLASS
"Notkin's design of a multi-tiered air supply system and the application of cooling with air movement, rather than costly air conditioning, helped reduce both construction costs and long-term operational costs. Notkin's creative approach to the mechanical design for the Museum resulted in a state-of-the-art building, and a Hot Shop Amphitheater that is safe, comfortable and enjoyed by artists and visitors alike."
- Laurie B. Haag, Deputy Director, Museum of Glass, International Center for Contemporary Art

EXPERIENCE MUSIC PROJECT
"Overall, Notkin was conscientious about providing a detailed, quality system that met the owner's needs and coordinated with the architectural goals. When the owner's needs changed, Notkin was flexible in changing the design of the mechanical system, often under tight time and cost constraints."
- George Metzger, Partner, Frank O. Gehry & Associates

EDMONDS SCHOOL DISTRICT
"For more than 20 years, I have worked with John Rowland and his firm on various projects in the greater Seattle area, and without exception, Notkin Engineering has always provided exemplary professional support as a member of the Design Team."
- Trevor Hart, former Design & Construction Manager for the Edmonds School District

BENAROYA RESEARCH INSTITUTE at VIRGINIA MASON MEDICAL CENTER
"Sandy Bonderman played an integral role in the construction phase of this building. She worked with us on issues to determine the optimal solution not only to benefit the owner, but also for the feasibility of installation and coordination among all trades. In an industry as competitive as construction is, it is wonderful to know that a trustful teamwork relationship can grow and prosper. I can't imagine working on another project of such magnitude and difficulty without being part of the same team."
- Rick G. Harbison, Project Manager for MacDonald-Miller

HARBORVIEW MEDICAL CENTER
"Your services have always been performed in the most professional manner. The hospital has appreciated your early involvement, your thorough presentation, and your ability to work both with the county and the many agencies that make up the approval process. Notkin Engineering's responsiveness to our needs and follow-through during construction have been exceptional."
- Charles Blackburn, Maintenance Supervisor

WHIDBEY NAVAL AIR STATION, ENERGY MONITORING & CONTROL SYSTEM REPAIR & UPGRADE
"The team achieved the goal of developing a comprehensive and thorough design/build RFP involving extensive and detailed field work in 102 facilities. The accuracy of this work will greatly enhance the success of this project. The team was very responsive and willing to put forth the additional effort necessary to give the Navy a good product."
- Phillip Baker, former Design Manager Naval Air Station Whidbey Island

USCG MARINE SAFETY OFFICE REHABILITATION, VALDEZ, AK
"I want to thank you and your firm for the outstanding work you provided for this project. Your contribution helped make this project a success. The US Coast Guard is pleased with the project we delivered and services provided by our project team."
- Mark Adolphsen, Anderson Koch & Smith

"Mr. Swartz was extremely resourceful in providing sound engineering recommendations during the life of the project. He worked diligently to establish a professional rapport with his Coast Guard customers and met all challenges head-on...The successful completion of this project is clearly reflective of the outstanding dedicated personnel at Notkin Engineering."
- J. T. Peck, U.S. Coast Guard

ENGINEERING STUDY FOR REPLACEMENT FOR FUEL STORAGE TANKS, NAVAL HOSPITAL BREMERTON
"Notkin Engineers provided a thorough evaluation of alternatives for replacing two existing single wall underground fuel storage tanks. The Customer liked the vault option, which was a higher first cost, but provided a much longer useful life for the renovated facility."
- Wanda Edwards, Contracting Officer, Navy EFA Northwest